Part 3
The corner of the North and West stand from the far end of the North car park
a closer look at the blockwork progressing in this corner
lights and speakers are beng fitted to the North stand.
The lights point to the currently open, unclad back of the North stand, rather than downwards.
Make of that what you will
cladding of some sort awaiting to be fitted behind the west stand
Pile drive peaking out from the side of Tesco's
A closer look of the piling for the bridge in operation
Turning to the Tesco's managed to get these pics
This is the ramp to the bridge
you may have noticed some spots on the shots above. This was caused by the heavy rain.
You can see the guttering doing its work on the roof. Though they still need to fit all the drain pipes
Finally some pics from the link road side